Irving January 15, 2016January 19, 2016Robyn Mueller Comment Electrical contractor still identifying some areas he wants to be fixed or tightened up. Electrician has gone through the list and has finished. [...]
Irving – Day 86 January 2, 2016January 7, 2016Robyn Mueller Comment Drywall and finishing things up on hold as we wait for the electrical inspector to give us the all clear. All the knob [...]
Irving – Day 69 December 15, 2015January 7, 2016Robyn Mueller Comment The old wood floor in the kitchen was too badly damaged and not laid down correctly to begin with so a new wood [...]
Dorchester – Day 37 December 5, 2015January 7, 2016Robyn Mueller Comment Removed and installed insulation in attic. Fixed wiring in wall at the top of the stairs, master bedroom. [...]
Irving – Day 24 October 30, 2015January 7, 2016Robyn Mueller 1 Met with Tony and discussed the master bath again. We need to bump out the left wall a little bit to accommodate the [...]
Irving – Day 17 October 23, 2015January 7, 2016Robyn Mueller Comment Demo almost done, lots of wiring to clean up. Removing all the knob and tube. [...]