Dorchester – Day 53 December 22, 2015January 7, 2016Robyn Mueller Comment Kitchen header is in place, wall is removed. Kitchen cabinets have been ordered as well as the bath cabinets. Master bath framed in, [...]
Vermont – Day 20 December 20, 2015January 7, 2016Robyn Mueller Comment Architect drawings received. Header needed in kitchen/dining room in order to completely remove those walls and give us the open floorplan. Demo continues. [...]
Vermont – Day 15 December 15, 2015January 7, 2016Robyn Mueller Comment Paid Tony for invoice 1052 for $5985.05 includes 50% window deposit, architect deposit and $3000 contract deposit. Demo started in the kitchen. [...]
Girard December 15, 2015January 7, 2016Robyn Mueller Comment Architect plans in for the dormer. Submitted to the city. [...]
Dorchester – Day 47 December 15, 2015January 7, 2016Robyn Mueller Comment New garage door installed. [...]
Irving – Day 69 December 15, 2015January 7, 2016Robyn Mueller Comment The old wood floor in the kitchen was too badly damaged and not laid down correctly to begin with so a new wood [...]
Hawk’s Nest – Day 10 December 11, 2015January 7, 2016Robyn Mueller Comment Met with a contractor to start the bid process. Taking this one very slowly as our renters can ski out to the slopes [...]
Vermont – Day 9 December 9, 2015January 7, 2016Robyn Mueller Comment Leone Brothers Painting able to power wash exterior and paint the white siding. [...]
Dorchester – Day 37 December 5, 2015January 7, 2016Robyn Mueller Comment Removed and installed insulation in attic. Fixed wiring in wall at the top of the stairs, master bedroom. [...]