Kitchen header is in place, wall is removed. Kitchen cabinets have been ordered as well as the bath cabinets. Master bath framed in, shower base in place.
Dorchester – Day 53
![](https://blackcombequity.com/wp-content/uploads/2016/01/Screenshot-2016-01-07-14.21.51-752x440.png)
Kitchen header is in place, wall is removed. Kitchen cabinets have been ordered as well as the bath cabinets. Master bath framed in, shower base in place.