Met with Tony and discussed the master bath again. We need to bump out the left wall a little bit to accommodate the shower. Get the specs to him on the skylight and bring it over next week. Confirmed we are tearing down the ceiling in the guest room upstairs, then drywall and four can lights to match the two bedrooms downstairs. Discussed position of cans in the kitchen and the placement of the dining room chandelier. A structural issue was discovered behind the wall by the window where the kitchen sink goes, not properly done so the new window would probably crack. A fix was done to support that area correctly. Went through the junk that was left in the garage by the previous owner so Mark could clean it out while the dumpster is still on site.
Skylight will look great!